WG43-10×2100 leveling machine
1, summarize:
this machine adopted several rollers working principle to make the plate repeat inside the rollers for removal of internal stress. It is widely used in vehicle, metal construction shipping ,container manufacturing.
2, main technical data:
1\plate strength :σb≤450Mpa
2\thickness 2.5-10mm: 2100mm(width)
3\leveling rolls: 11pcs
4\roller material : 40Cr
5\roller diameter : 160mm
6,distance of leveling rollers 170mm
7\leveling speed: 015m/min
8\leveling precision : 1.5mm/1000mm ,2mm/1
9\main motor : 61KW
10,support rollers 3group 6 row
11,diameter of support rollers 165mm
12,hardness of roller surface HRC52-58
3,this is the heart equipment. composed of power and main motor
Power part is composed of leveling base, speed reducer, YWZ arrester, coupling, power distribute box, joint spindle joint sleeve, universal drive shaft and so on. Main motor equip with high power direct current adjust motor and high capability direct current adjustment. With more high starting pitch of strand than rating, less voice and good reliability.
Main motor is separated up and down two rolls each part. composed of machine base, double housing type frame, up/down bearing base, beam, roll support ,roll support frame , roll support base , worm wheel and worm pole drive to control the upper roll come up and down. Two speed reducers adjust the distance of up and down in entrance and exit rolls. Simile adjustment manually. display on the percent gauge. Leveling working roll 6CrWMoV material , support roll material is 40Cr. Its forming procures is modulator and intermediate frequency quench and surface plating Cr precise grand, no mark on the surface of sensitivity material .the hardness of leveling working roll is HRC55-58, the hardness of support
roll is HRC48-53. We adopt needle roller bearing and plane bearing support leveling roller so as to reduce the resistance of whole
4 the power is 380V50HZ 3PH composed of electrical box, control working table, PLC control system.
5 guarantee :one year as from the date of installation and acceptance.
6\payment :
This machine is special machine. The buyer should pay 35% of total payment advanced then confirm the contract and start produce.
7,delivery time60 days after receiving the first payment.
8 main parts
1\bearing china
2\main motor china
3\PLC OMRON
4\electrical parts Siemens
5\gear reducer china